« Back

Merrimack College Storage Building
North Andover, MA
Project Description
This project consisted of a new 3,000 sf pre-engineered Varco Pruden steel storage building. Site work, electrical and HVAC were all included in the final project.
The building abutted wetlands making the site work extensive. Due to the location of the building, accessing the electrical service was a challenge which was resolved by creativity and cooperation with utility companies.
Key Facts
Location: North Andover, MA
Architect/Engineer: Channel
Scope: New, ground up, Pre-engineered steel building for storage of basketball flooring and accessories.